MPP Solar PIP-MS 1-5KVA Guide d'installation Page 13

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 12
13
7. LCD Setting and Display
Setting Program:
Program
Description
Selectable option
28
AC output mode
*This setting is only
available when the
inverter is in standby
mode (Switch off).
Single:
When the units are used in parallel with
single phase, please select “PAL” in program
28.
It is required to have at least 3 inverters or
maximum 6 inverters to support
three-phase equipment. Its required to
have at least one inverter in each phase or
its up to four inverters in one phase. Please
refers to 5-2 for detailed information.
Please select 3P1 in program 28 for the
inverters connected to L1 phase, 3P2 in
program 28 for the inverters connected to
L2 phase and 3P3 in program 28 for the
inverters connected to L3 phase.
Be sure to connect share current cable to
units which are on the same phase.
Do NOT connect share current cable
between units on different phases.
Besides, power saving function will be
automatically disabled.
Parallel:
L1 phase:
L2 phase:
L3 phase:
30
PV judge condition
(Only apply for
setting “Solar first
in program 1: Output
source priority)
One Inverter
(Default):
When ONE is selected, as long as one of
inverters has been connected to PV
modules and PV input is normal, parallel or
3-phase system will continue working
according to rule of solar first setting.
For example, two units are connected in
parallel and set “SOLin output source
priority. If one of two units has connected to
PV modules and PV input is normal, the
parallel system will provide power to loads
from solar or battery power. If both of them
are not sufficient, the system will provide
power to loads from utility.
All of Inverters:
When ALL is selected, parallel or 3-phase
system will continue working according to
rule of solar first setting only when all of
inverters are connected to PV modules.
For example, two units are connected in
parallel and set “SOLin output source
priority. When selecting ALL in program
30, its necessary to have all inverters
connected to PV modules and PV input is
normal to allow the system to provide
power to loads from solar and battery
power. Otherwise, the system will provide
power to loads from utility.
Vue de la page 12
1 2 ... 8 9 10 11 12 13 14 15 16

Commentaires sur ces manuels

Pas de commentaire